Valleyview Cableways Rehabilitation


Environment and
Climate Change
Canada (ECCC)
Alberta Branch

Client:

Timeline:

August – September 2023

Infrastructure,
Specialized

Classification:

Location:

Valleyview

Project Description:

This project involved the rehabilitation of existing cableway structures at two remote locations near Valleyview, Alberta. SVEMY Construction was responsible for the installation of new anchors, tieback and backstay cables, and safety loops to enhance the structural integrity and longevity of the cableway systems. The work required precise execution in challenging conditions, ensuring compliance with environmental and safety regulations while maintaining uninterrupted hydrometric monitoring capabilities for ECCC. Through strategic planning and technical expertise, the project was completed efficiently, reinforcing critical infrastructure for environmental data collection.

Previous
Previous

Jasper 911 Renovation (Renovations) (Infrastructure)

Next
Next

Port O’ Call – Jetz Bar Renovation (Renovations) (Buildings)