Foothills Hospital
McCaig Tower Digital Imaging Angiography Room

Project Description:


Client:

Timeline:

Private Client

2021

Classification:

Location:

Medical, Specialized

Calgary

SVEMY Construction was part of the larger construction team responsible for building a new Digital Imaging Angiography (DI Angio) room in the McCaig Tower at Foothills Hospital. The project required the implementation of stringent infection control measures in a high-traffic hospital environment, ensuring minimal disruption to ongoing medical procedures while integrating cutting-edge diagnostic imaging technology.

Previous
Previous

Saskatoon RUH – Azurion 7 C20 Cath Lab Installation (Medical) (Specialized)

Next
Next

Colonel Walker Residence – Historical Restoration (Historical) (Renovations)